Asked | Open questions | Answered
Points Date Pair Term / Answer given Level Status Gloss
4 Jul 9 '20 esl>eng placas de características rating plates easy closed ok
4 Jun 24 '19 eng>esl to assess the damaged elevator.. para evaluar el ascensor dañado easy closed ok
4 May 1 '19 eng>esl ADDITIVES aditivos easy closed ok
4 Apr 25 '19 esl>esl Que contenga hasta un 40% de (o hasta 40% de) que contenga hasta un 40% de easy closed ok
- Feb 25 '14 esl>eng Areas de aporte intake / catchment / inflow areas easy open no
- Apr 13 '06 esl>eng diseño por durabilidad de obras de hidraulicas de conduccion de hormigon durability [factorrs in the design of concrete pipe works easy open no
4 Jun 28 '16 eng>esl drive off/forward/reverse accionamiento parado/hacia adelante/hacia atrás easy closed ok
- May 29 '03 esl>eng con entrada y salida de agua A lake/pond designed with water flowing in from stream XX, before later returning. easy open no
4 Oct 15 '15 esl>eng valores de NOX referidos al 5% de O2 NOX values are referenced to 5% O2, 760 mm Hg.... easy closed ok
4 Oct 14 '15 eng>eng preferentially/with priority The control unit prioritizes the operation of device A (over device B). easy closed ok
- Aug 7 '15 eng>esl build sheet hoja / plan de diseño / montaje easy closed ok
- Mar 6 '15 esl>eng perfiles de polipropileno polypropylene/plastic profiles/cross-sections easy closed ok
- Oct 10 '14 eng>esl SAP S.O. SAP OS easy open no
- May 22 '14 eng>esl (Bit Detaching) Chuck llave de portabrocas easy just_closed no
4 Feb 25 '14 esl>eng Trazado en planta floor plan easy closed ok
- Nov 26 '13 esl>eng rasante elevation easy closed ok
- Jun 27 '13 esl>eng recuperar la planificación prevista to return to the planned schedule easy closed ok
- Jan 26 '12 esl>eng portada de bienvenida welcome message board easy just_closed no
- Nov 9 '11 esl>eng esquemas de trazados schematic designs easy just_closed no
- Oct 12 '11 esl>eng Fabricacion de maquinas para empaque de productos V-guide belts for direct tracking / V-guide drivebelts for direct tracking easy open no
- Jun 21 '11 esl>eng prueba de aferición calibration certificate easy open no
- Apr 27 '11 esl>eng permanente innovacion en ingenieria con pleno conocimiento del desarrollo indust . easy open no
3 Oct 18 '10 esl>eng Husillo....pasos de separación a clamp screw (or band screw) ... with progressive seperations easy closed ok
Asked | Open questions | Answered